Rod Cameron Pools, established 1968
A finished rooftop apartment pool in smooth blue marble with timber decking, stone coping and city views

Tired concrete pools, relined in real marble by hand.

We strip old pebble, paint or lining back to sound concrete and trowel on crushed marble in white cement. Homes, apartment blocks, hotels and clubs in Brisbane, on the Gold Coast and on the Sunshine Coast.

Established 1968QBSA Lic No. 48762Six-year guarantee

We only use marble, because a pebble finish leaves troughs a pool cleaner cannot reach.

Pebble troughs up to 5 mm deep

5 mmcleaner brush

Trowelled marble smooth, so the brush reaches all of it

cleaner brush
Drawn at roughly ten times actual size, with the pebble texture taken from one of our job photos. The brush rides the tops; algae settles in the troughs below it.
A Rod Cameron Pools tradesman trowelling marble onto the wall of a drained pool by hand

Crushed real marble and the finest white cement, about 2.5 tonnes for an average pool, trowelled by hand until it is smooth. Marble costs slightly more than pebble. We think it is worth it.

Rod’s film: the marbling stagestarts at 0:44

A pool at home.

A drained home pool with a crack running through the old surface beside tiled stepsBefore: the crack
The same home pool steps after repair and marbling, filled with blue waterAfter: the same steps
A home pool, the same steps before and after: crack repaired, surface prepared, marble on.

Most pools we see are 20 to 40 years old: cracked, leaking, stained, or covered in a pebble or painted finish that has had its day. We drain the pool, take the old finish off, repair the cracks and any exposed steel, and line it in marble.

  1. Day oneWe drain the pool.
  2. Day twoWe prepare the old surfaces and apply the binding keys.
  3. Day threeThe marble goes on and the pool starts refilling.

A guide for a typical home pool. Size and the state of the old finish change it.

“Very happy with the pool resurfacing from Rod Cameron Pools. Rod was here to talk us through the work, his team was professional and friendly. Everything went very smoothly.”Michael Fomin, pool resurfacing
“Rod resurfaced our very damaged pool … Rod made sure the tenant we had at the time and the Pool maintenance team we use we’re aware of what needed to be done.”Sabreena Taylor, rental property
“I want to say a BIG THANK YOU TO ROD AND HIS TEAM. For turning our tired 42 year old pool, to a amazing looking pool.”Sandra Jacobson, 42-year-old pool

A pool for a building.

Hotels, apartment blocks, resorts and clubs. We renovate surfaces, tiles, coping and drains, match tile and surface colours, and plan the work around the people who use the pool.

Commercial pools we have renovated, and clients
The View HotelHamilton, BrisbanePool and spa: pebble off, joints repaired, new tiles and coping, blue marble
Goodwin ApartmentsKangaroo Point, BrisbaneFibresheen interior removed, new expansion joint, marble
The SanctuaryMermaid Waters, Gold CoastTwo pools about 30 years old, done together in blue marble
Couran CoveResortA very large pool: pebble to marble, re-tiled
Resort poolTugan, QueenslandWorn pebble replaced with tiles and marble
Also on our client listFour Points by Sheraton Brisbane, Hotel Grand Chancellor Brisbane, Arana Leagues Club, Golden Riviera
The View Hotel pool at Hamilton before renovation: green water and algae over a loose pebble finishBefore
The View Hotel pool drained and stripped back to grey concreteStripped
The View Hotel pool after renovation, bright blue smooth marble beside the rock wallMarbled
The View Hotel, Hamilton. Pool and spa by the river. The old pebbles had come loose and were holding algae. We removed the worn surface, repaired the expansion joints, replaced all the tiling and coping, and finished it in smooth blue marble.
The finished Goodwin Apartments pool at Kangaroo Point in blue marble with new terracotta coping

Goodwin Apartments, Kangaroo Point: out with the Fibresheen.

  1. The worn painted Fibresheen interior of the Goodwin Apartments poolThe painted Fibresheen interior had worn through.
  2. The old interior broken up and removedAll of it came off and left the site.
  3. The prepared shell with its new expansion jointTiling, coping and a new expansion joint.
  4. Marbling the interior as the pool begins to fillMarbling last, then the water goes in.

The awkward ones. We take on renovations where there is little or no machinery access at all.

Project H: the old pool so degraded that its walls were rusted and broken
Before: rust through the old wall
Project H: new footings and steel being laid inside the old pool
New footings inside the old shell
Project H: the new pool lining inside the old structure before filling
The new pool, ready to fill

A pool inside a pool.

This pool was so degraded that relining it was not an option. We kept the existing structure, added new footings in the floor and bolstered the wall, then built the new pool inside it.

Every photo from this job

Sixteen more renovations, photographed on site

Before the drain-down, and after the refill.

After the refill you get our water instruction sheet, prepared by NATA, and a six-year guarantee.

Rod’s film: job completion and quality assurancestarts at 1:20

Is my pool too old to renovate?

Rarely. Many pools are now 20 to 25 years old or more and need renovating because of cracks, or could simply do with a fresh look. We have renovated pools over 40 years old, and when a structure is too far gone we can build a new pool inside it.

Can a cracked or leaking concrete pool be repaired?

Usually, yes. We remove pebble, exposed aggregate and lifting membrane liners, repair structural cracks and exposed reinforcing steel, fix cracks and other leaks, then sandblast, chemically clean and wash the surface before the binding keys go on.

Can you match our existing tiles and coping?

Yes. We can match tiles and surface colours, repair coping, and update the surround and walkways to suit the property.

Do you take the rubbish away?

Yes. We remove the old interior, tiles and debris, take all the rubbish away and leave the property clean and tidy.

What guarantee do you give?

We give a six-year guarantee.

What happens after the pool is refilled?

We give you our instruction sheet for preparing the water so your family can swim. It was prepared by the National Association of Testing Authorities (NATA), and it keeps the water correct, makes the pool cheaper to maintain and helps filters, pumps and other equipment last longer.

Do you build new pools?

Yes. We build new pools in sprayed concrete, in any shape, size or depth: rectangles, kidney and oval shapes, and pools with spas, finished in smooth marble or tiles and materials of your choice. A typical family pool is about nine metres long, four metres wide and 1.7 metres deep.

Which areas do you work in, and are you licensed?

Brisbane, the Gold Coast and the Sunshine Coast, for homes, apartment buildings, hotels, resorts and clubs. Authorised Lic No. 48762, licensed under the QBSA Act 1991, building and renovating pools since 1968.

Rod quotes at the pool.

Tell us the suburb and what is wrong with the pool. Rod will arrange a time that suits you to look at it and quote on site.

0411 596 707

Rod Cameron at a finished pool, from his own film about job completion
Rod at a handover, from his own film.

Concept site: this form does not send. Use the phone number or email instead.

Call 0411 596 707Enquire